Housekia MEP Inspection Checklist
🧠 Quick Summary
Plan Right • Install Right • Inspect RightA building is only as good as its MEchanical, Electrical, and Plumbing (MEP) systems. Use this checklist to ensure your project is safe, functional, durable, and code-compliant before handover. 🏗️ 📌 GENERAL PRE-INSTALLATION CHECK☐ MEP drawings approved and coordinated with architectural/structural plans☐ No clashes between pipes, ducts, and beams☐ Qualified MEP engineers engaged☐ Correct material specifications confirmed☐ Safety standards followed on site☐ Inspection schedule created🔧 MECHANICAL (HVAC & SERVICES) CHECKLISTVentilation & Cooling☐ AC capacity matches room size☐ Proper airflow/vent placement☐ Outdoor units positioned correctly☐ Drain pipes connected and leak-free☐ No air leakage from ducts☐ Noise levels acceptablePumps & Equipment☐ Water pumps tested☐ Proper mounting and vibration control☐ Backup pump available (if required)☐ Equipment easily accessible for maintenanceFire Protection☐ Fire extinguishers installed☐ Fire alarms functional☐ Smoke/heat detectors tested☐ Emergency exits unobstructed👉 Goal: Comfort, airflow, and safety⚡ ELECTRICAL CHECKLISTWiring & Installation☐ Correct cable sizes used☐ Wires properly insulated☐ Conduits concealed neatly☐ No exposed wiring☐ Distribution board labeled clearlyPower & Protection☐ Circuit breakers installed☐ Earthing/grounding provided☐ Surge/lightning protection available☐ No overloading of circuits☐ Generator/inverter changeover workingLighting & Fixtures☐ All lights functional☐ Switches and sockets secure☐ Outdoor/security lights installed☐ Energy-efficient bulbs usedTesting☐ Voltage tested☐ Continuity tested☐ Load test completed☐ Backup systems tested👉 Goal: Reliable power and zero fire risk🚿 PLUMBING CHECKLISTWater Supply☐ Pipes pressure-tested☐ No leakage at joints☐ Proper pipe sizing☐ Borehole/tank connections secure☐ Clean water source confirmedFixtures☐ Toilets flushing correctly☐ Taps and showers working☐ No dripping or seepage☐ Proper sealing around fittingsDrainage & Waste☐ Proper slope for drainage☐ No blocked pipes☐ Manholes accessible☐ Septic/soakaway properly located☐ No foul smellWaterproofing☐ Bathrooms waterproofed☐ Kitchen floors sealed☐ Roof drainage working☐ No water pooling👉 Goal: Clean water in, waste out safely📌 FINAL SITE TESTING☐ All systems tested simultaneously☐ No leakages or sparks☐ No strange sounds/vibrations☐ Emergency systems functional☐ As-built drawings provided☐ User manuals handed over☐ Maintenance plan prepared🏠 Quick Reference GuideSystemWhat to Watch ForMechanicalCooling, airflow, pumpsElectricalSafe wiring, power stabilityPlumbingNo leaks, proper drainage🚨 Housekia Pro Tips✅ Plan MEP before construction✅ Never hide faulty pipes/wires inside walls✅ Use certified electricians & plumbers only✅ Test everything before handover✅ Quality materials save long-term costs✅ Housekia StandardA building is not complete until all MEP systems are safe, tested, and fully functional.
Plan Right • Install Right • Inspect Right
A building is only as good as its MEchanical, Electrical, and Plumbing (MEP) systems.
Use this checklist to ensure your project is safe, functional, durable, and code-compliant before handover.
🏗️ 📌 GENERAL PRE-INSTALLATION CHECK
☐ MEP drawings approved and coordinated with architectural/structural plans
☐ No clashes between pipes, ducts, and beams
☐ Qualified MEP engineers engaged
☐ Correct material specifications confirmed
☐ Safety standards followed on site
☐ Inspection schedule created
🔧 MECHANICAL (HVAC & SERVICES) CHECKLIST
Ventilation & Cooling
☐ AC capacity matches room size
☐ Proper airflow/vent placement
☐ Outdoor units positioned correctly
☐ Drain pipes connected and leak-free
☐ No air leakage from ducts
☐ Noise levels acceptable
Pumps & Equipment
☐ Water pumps tested
☐ Proper mounting and vibration control
☐ Backup pump available (if required)
☐ Equipment easily accessible for maintenance
Fire Protection
☐ Fire extinguishers installed
☐ Fire alarms functional
☐ Smoke/heat detectors tested
☐ Emergency exits unobstructed
👉 Goal: Comfort, airflow, and safety
⚡ ELECTRICAL CHECKLIST
Wiring & Installation
☐ Correct cable sizes used
☐ Wires properly insulated
☐ Conduits concealed neatly
☐ No exposed wiring
☐ Distribution board labeled clearly
Power & Protection
☐ Circuit breakers installed
☐ Earthing/grounding provided
☐ Surge/lightning protection available
☐ No overloading of circuits
☐ Generator/inverter changeover working
Lighting & Fixtures
☐ All lights functional
☐ Switches and sockets secure
☐ Outdoor/security lights installed
☐ Energy-efficient bulbs used
Testing
☐ Voltage tested
☐ Continuity tested
☐ Load test completed
☐ Backup systems tested
👉 Goal: Reliable power and zero fire risk
🚿 PLUMBING CHECKLIST
Water Supply
☐ Pipes pressure-tested
☐ No leakage at joints
☐ Proper pipe sizing
☐ Borehole/tank connections secure
☐ Clean water source confirmed
Fixtures
☐ Toilets flushing correctly
☐ Taps and showers working
☐ No dripping or seepage
☐ Proper sealing around fittings
Drainage & Waste
☐ Proper slope for drainage
☐ No blocked pipes
☐ Manholes accessible
☐ Septic/soakaway properly located
☐ No foul smell
Waterproofing
☐ Bathrooms waterproofed
☐ Kitchen floors sealed
☐ Roof drainage working
☐ No water pooling
👉 Goal: Clean water in, waste out safely
📌 FINAL SITE TESTING
☐ All systems tested simultaneously
☐ No leakages or sparks
☐ No strange sounds/vibrations
☐ Emergency systems functional
☐ As-built drawings provided
☐ User manuals handed over
☐ Maintenance plan prepared
🏠 Quick Reference Guide
System
What to Watch For
Mechanical
Cooling, airflow, pumps
Electrical
Safe wiring, power stability
Plumbing
No leaks, proper drainage
🚨 Housekia Pro Tips
✅ Plan MEP before construction
✅ Never hide faulty pipes/wires inside walls
✅ Use certified electricians & plumbers only
✅ Test everything before handover
✅ Quality materials save long-term costs
✅ Housekia Standard
A building is not complete until all MEP systems are safe, tested, and fully functional.